An office relocation in Calgary is planned backward from one date: the first day the new office has to work. Every other date in the plan, from the lease signing to the last box, is set by what has to be true on that morning. The move itself is one day. The plan around it runs for months.
Calgary adds steps that a generic checklist leaves out. The City treats a business that changes location like a new licence application, so location approval should be checked before the lease is signed. After the move, an Alberta corporation has 15 days to update its address with Corporate Registry. The CRA address is changed separately.
This guide lays out the plan as phases, owners and deadlines. For the task list to print and tick off, use our office moving checklist. For the budget, see how much a commercial office move costs in Calgary.
It starts before the lease. Some of the costliest problems in an office move start before anyone books a mover: a space the business cannot be licensed to operate in, a server room with no cooling, or a possession date that leaves no time for IT. The project plan gives each decision a date and an owner, so nothing waits for moving week.
Our checklist starts the active moving work two months before moving day. That is when the mover is chosen, insurance for the move is checked, and furniture for the new space is ordered. One month out, the floor plan is finalized with printer and network locations, and mail forwarding is set up. The phases below put those tasks into a schedule.
| Phase | When | Main decisions | Owner |
|---|---|---|---|
| Site and approvals | Before the lease is signed | Location approval, space plan, possession date | Executive sponsor and facilities |
| Planning | Two months before the move | Mover selected, move insurance checked, furniture ordered, budget approved | Move coordinator |
| Detailed design | One month before | Floor plan with seating, printers and network points, mail forwarding, staff briefing | Coordinator, IT lead, department reps |
| Preparation | One to two weeks before | Packing, labels, donation list, building move rules confirmed | Department reps and facilities |
| Move | Moving day or weekend | Disconnect, move, reassemble, reconnect | Mover's project lead and IT lead |
| First workday | The morning after | Testing, issue log, help desk | IT lead and coordinator |
| Close-out | Within 15 days and after | Corporate Registry, CRA, licences, client and vendor notices | Coordinator and finance |
The table is a planning frame, not a fixed rule. A five-person suite can compress it. A multi-floor office with a server room, new furniture and a phased move needs more room in every phase.
In Calgary, approval comes first. The City says business licences and approvals are location-specific, and moving a business is treated like a new licence application, with new approvals and inspections. There is no base licence fee for a move, but fees apply for the planning and fire approvals the new location needs.
The City's advice is direct: do not sign a lease until you have checked location approval. The Planning Services Centre can confirm whether the use is allowed at the new address and which permits the space needs. A tenancy change, development permit or building permit can each add time, and none of them is solved by a faster moving crew.
This is also the point to ask the landlord for the building's move rules. Freight elevator booking windows, loading dock hours, floor protection requirements and the certificate of insurance the building needs from your mover all shape the schedule. Ask for them in writing from both the old and the new building.
An office move fails when everyone is responsible and no one decides. Name one move coordinator with the authority to make calls on the day, and give every workstream an owner. The moving company's project lead then has one person to work with instead of ten.
| Role | Owns | Key output |
|---|---|---|
| Executive sponsor | Budget, date, final sign-off | Approved plan and moving date |
| Move coordinator | Schedule, mover, building liaison, decisions on the day | Master timeline and contact list |
| IT lead | Network, servers, phones, workstations | Disconnect and reconnect plan, tested before staff arrive |
| Facilities contact | Floor plan, furniture, landlords, access | Seating plan and building move rules |
| Department representatives | Packing and labelling for their team | Labelled boxes and a list of special items |
| Finance or records | Address changes, vendors, documents | Registry, CRA and vendor updates completed |
Staff communication deserves its own owner as well. Our guide on preparing employees for an office move covers what to tell teams, when, and what they pack themselves.
IT sets the real deadline. Desks can be unpacked on Monday afternoon. A network that is not working on Monday morning stops the whole office. Treat IT as a separate project inside the move, with its own plan and its own test.
Calgary Office Movers handles technical moves, including server rooms and sensitive electronic equipment, and offers a specialized service for confidential documents. Equipment that will be donated rather than moved needs its data wiped first. That step is the business's responsibility and has to happen before the devices are staged.
Move outside working hours. Calgary Office Movers operates seven days a week, including evenings and holidays, at the same rate, so a Friday evening or weekend move does not carry an overtime premium. The office closes on Friday and reopens at the new address on Monday.
Larger offices can move in phases, one department or floor at a time, with the IT core moved first. Each phase needs its own building bookings, so align the schedule with the elevator and loading dock windows from both landlords. A phase that misses its elevator window waits for the next one.
"An office move is judged on Monday morning, not on Friday night. The sequence that works is simple: IT out last, IT in first, desks and boxes in between. If the network works when people arrive, the move worked," says Adam O'Keefe, CEO, Calgary Office Movers.
The move is not finished when the last desk is placed. Several records are tied to your address, and some have deadlines.
| Record | What to do | Timing |
|---|---|---|
| City of Calgary business licence | Apply for the move as a new licence application with approvals | Before operating at the new location |
| Alberta Corporate Registry | Provide the address update through an authorized service provider | Within 15 days of the change |
| CRA business address | Update it in your CRA business account under Profile, then Manage addresses | As soon as the address changes |
| Set up business mail forwarding with Canada Post | About one month before the move | |
| Clients, vendors, banks, insurers | Send the new address from the master contact list | Before and after the move |
Alberta corporations provide address updates to Corporate Registry within 15 days, and the registry does not charge for the update itself, though service providers charge a fee. The CRA business address is changed separately. The CRA now sends most business correspondence through My Business Account rather than by paper mail, so it is worth confirming the email address on file in the same session.
Decide early. A new floor plan often leaves desks, chairs and storage behind. Calgary Office Movers coordinates donation drop-offs with eight Calgary charity partners as part of the move, and the planning works best when donation items are identified and separated one to two weeks before the move date.
Stage the items in a clearly labelled area so they are not loaded with the furniture going to the new office. Our article on what Calgary businesses do with office items they no longer need explains which organizations accept what and how the drop-off is routed.
Ask for a walkthrough and a written plan, not a phone estimate. The quote should name the crew size and hours, the move window, and what is included.
Our guide on finding a reliable company for moving your business covers how to compare movers, and the office moving FAQ answers the common questions about estimates, packing, storage and disposal.
"The part of an office move that cannot be rushed is everything outside the truck. Approvals, elevator bookings and the internet installation all run on someone else's calendar, so they belong at the start of the plan. A crew can work faster. A permit office and a landlord will not," says Adam O'Keefe, CEO, Calgary Office Movers.
A Calgary office move is planned backward from the first workday. Approvals come before the lease, owners are named for every workstream, IT is tested before staff arrive, and the address changes are filed after the move within their deadlines. The moving day is the shortest part of the plan.
The limit is time. A crew can move an office over a weekend. It cannot shorten a permit review, an internet installation lead time or a landlord's elevator schedule. Start with those, and the rest of the plan fits around them.
Request a free estimate and an on-site walkthrough, and we will build a step-by-step moving plan around your date. Learn more about our commercial moving services in Calgary.
It is a schedule of decisions and tasks, worked backward from the day the new office has to be operational. A good plan names an owner for every workstream, sets dates for approvals, IT, furniture and communication, and ends with a first workday checklist. It turns a move from a single moving day into a sequence the whole company can follow.
Our office moving checklist starts two months before moving day, when the mover is chosen and insurance is checked. Approvals for the new location come earlier, before the lease is signed, because the City of Calgary treats a business move like a new licence application. Larger offices, server rooms and fit-outs need more lead time than a small suite.
The City of Calgary says business licences and approvals are location-specific, so moving is treated like a new licence application with new approvals and inspections. There is no base licence fee for the move itself, but planning and fire approval fees apply. The City advises checking location approval before you sign a lease.
Alberta corporations provide address updates to an authorized Corporate Registry service provider within 15 days of the change. The registry does not charge for the update, though service providers charge a service fee. Your CRA business address is changed separately, in your CRA business account under Profile and Manage addresses.
Yes. Calgary Office Movers works seven days a week, including evenings and holidays, at the same rate. An after-hours move lets the office close on Friday and reopen at the new address on Monday. Building move rules, such as elevator booking windows and loading dock hours, still need to be confirmed with both landlords.
One move coordinator with authority to make decisions, supported by an IT lead, a facilities contact and a representative from each department. An executive sponsor signs off on the budget and the date. The moving company's project lead works with the coordinator, not with ten different people.
IT is planned as its own workstream: full backups before disconnection, labelled cables and devices, and a reconnection plan that is tested before staff arrive. Calgary Office Movers handles technical moves, including server rooms and sensitive electronics. Devices being donated must have their data wiped by the business before they are staged.